Gabion Retaining Wall Project in Germany: 15,000 sqm Riverbank Stabilization

Gabion Retaining Wall Project in Germany: 15,000 sqm Riverbank Stabilization
yle="color:#fff;margin-top:0">Project Overview
Project LocationBavaria, Germany
ProductPVC-Coated Gabion Baskets (4×1×1m, 5×1×1m)
Quantity3,200 units / 15,000 sqm
Wire SpecificationGalfan® Zn-5%Al, 4.0mm diameter, 80×100mm mesh
ClientGerman infrastructure contractor (name withheld per NDA)
Completion2023 Q3

The Challenge

A major riverbank stabilization project in southern Germany required 15,000 square meters of gabion retaining walls to prevent erosion along a 1.2km stretch of the Danube tributary. The engineering specification demanded:

  • Corrosion resistance exceeding 3,000 hours salt spray test — ruling out standard hot-dip galvanized wire
  • Custom basket dimensions with internal diaphragms every 1 meter
  • Full EN 10223-3 compliance with third-party testing certificates
  • Delivery within 45 days to meet the construction window before the rainy season

Our Solution

Haobo Metal proposed a Galfan® (Zn-5%Al-MM) coated wire solution with an additional PVC coating for maximum durability in the high-moisture riverbank environment.

Technical Specifications Delivered

Parameter Specification Test Standard
Wire Diameter4.0mm ±0.06mmEN 10218-2
Coating TypeGalfan® Zn-5%Al + PVCEN 10244-2
Coating Weight≥275 g/m² (Galfan) + 0.5mm PVCEN 10244-2
Mesh Opening80×100mmEN 10223-3
Salt Spray Resistance3,500+ hours (no red rust)ISO 9227
Tensile Strength540-680 N/mm²EN 10218-1

Production & Quality Control

The order was split into 5 production batches, each undergoing rigorous QC inspection:

  1. Raw Material Inspection: Wire rod chemical composition verified against EN 10218-1
  2. In-Process Check: Mesh opening tolerance measured every 50 baskets, wire diameter every 100 baskets
  3. Coating Test: Galfan coating weight tested via gravimetric method, PVC adhesion tested per EN 10245-1
  4. Pre-Shipment Inspection: SGS conducted final random sampling — zero defects found in 315-unit sample

Logistics & Delivery

3,200 gabion baskets were packed flat on 16 pallets, loaded into 4×40' HQ containers, and shipped from Tianjin Port to Hamburg via ocean freight (28 days transit). The full order was delivered 6 days ahead of the 45-day deadline.

Results

3,500+
Hours Salt Spray Resistance
0
Quality Defects at SGS Inspection
6 Days
Ahead of Schedule

The riverbank stabilization has now been in service for over 2 years with zero corrosion issues reported. The client has since placed two additional orders totaling 8,500 sqm for subsequent project phases.

Need Gabion Baskets for Your Infrastructure Project?

Send us your specifications — we'll provide a detailed quote with technical documentation within 24 hours.

Request Your Quote →

Related Articles